Reports until 16:21, Thursday 04 November 2010
H2 INS
michael.rodruck@LIGO.ORG - posted 16:21, Thursday 04 November 2010 (298)
Ops Day Summary
Contractors moving equipment from EY to EX
Pacific Industrial on site
Overhead Door on site
Richard fixed ADCUEX, which was red
Betsy and Corey removed the bellows from HAM1 to ISCT1
Cyrus power cycled the NPT, which took the DAQ out for a few minutes
Oscar baling on X-arm
Richard re-routed vacuum connections, which took the LVEA vacuum channels out for a few minutes
John and Mike L. installed a sock over the HAM1 chamber