Reports until 15:52, Monday 19 September 2016
H1 General
edmond.merilh@LIGO.ORG - posted 15:52, Monday 19 September 2016 (29800)
Shift Summary - Day

17:07 Jim to EY to check on the BRS power supply and to change a setting so that it will come back up after a power outage.

17:11 BRS at EY switched off.

17:15 Jason and Peter ou to the PSL enclosure to begin work reducing flow to possibly mitigate intensity noise.

17:30 Betsy out to LVEA to do TCS inventory

17:31 Travis out to LVEA to retrieve ITM Pcal camera

17:32 Jim back from EY

17:32 Jeff K to begin charge measurements

17:36 Jason called from enclosure - LASER is going DOWN

17:59 Travis back from LVEA

18:33 Travis headed to end stations for Pcal camera work. Switching BRS Guardian to VERY_WINDY as per Jim's wiki page under the SEI tab

18:59 Jason and Peter out of the enclosure. THe LASER is ON.

19:00 DAQ restart

20:28 Start initial alignment

20:45 Switched BRS back on at both ends

21:00 Begin locking sequence

15:55 Handing of to Jeff