Displaying report 1-1 of 1.
Reports until 00:06, Tuesday 20 September 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 00:06, Tuesday 20 September 2016 (29816)
Ops Evening Shift Summary
Title:  09/19/2016, Evening Shift 23:00 – 07:00 (16:00 - 00:00) All times in UTC (PT)
State of H1: Working relocking after Lockloss. Environmental conditions are OK. Microseism is low and stable. Seismic activity is a bit rung up in Y. X is also elevated but less than Y. This is consistent with a Gentle to Moderate Breeze (11 – 18 mph).     
Commissioning: Commissioners are working on improving stability at higher powers 
Outgoing Operator:  Ed
 
Activity Log: All Times in UTC (PT)

23:00 (16:00) Start of shift
06:59 (23:59) End of shift


Title: 09/19/2016, Evening Shift 23:00 – 07:00 (16:00 – 00:00) All times in UTC (PT)
Support:  Jenne, Sheila, Lisa, Matt,      
Incoming Operator: N/A

Shift Detail Summary: IFO locked for almost the entire shift. Currently at 51.1W and 35 plus Mpc. Environmental conditions are better than at the start of the shift, with both wind and seismic lower. Commissioners continue making improvements.   
Displaying report 1-1 of 1.