(corey, eric, greg, hugh, jim w, mitch)
#5
Last couple of days, we have prepped this ISI to put it in a box. This afternoon, this ISI should be canned for your enjoyment.
#6
Not much going on with this assembly since we are waiting for hardware for the Actuators and CP Sensors. I installed the CPS Sensor Heads on their mounting hardware (the mini-racks are on floor under the ISI).
#7
Optics Table has been de-tanged & now removing broken tangs. Stage-0 can be put on Assembly Stand as soon as #5 is boxed.