I performed the last checks (Spectra, static tests, pressure sensors checks, CPS offsets) on the ISI before the chamber closeout at BSC6. I started a last set of transfer functions for the night on ISI-BSC6 while Jeff.G is measuring L2 transfer functions on ITMY.