Reports until 16:03, Friday 23 September 2016
LHO General
thomas.shaffer@LIGO.ORG - posted 16:03, Friday 23 September 2016 (29950)
Ops Day Shift Summary

TITLE: 09/23 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Aquisition
INCOMING OPERATOR: Jeff
SHIFT SUMMARY: Some morning work on the AS_C QPD whitening, then after that was done locking started but was severely slowed by some ASC issues when engaging DRMI ASC. Kiwamu narrowed it down to either SRC1 or SRC2. When he engaged these separately, it seemed to work, but when the guardian did it simultaneously, it would crash within ~30s.
LOG: