Ops Evening Shift Summary
Title:  09/23/2016, Evening Shift 23:00 – 07:00 (16:00 - 00:00) All times in UTC (PT)
State of H1: IFO is locked at DC_READOUT. Environmental conditions are not that favorable. Winds are a Fresh Breeze with gusts to Near Gale (19-24 base, gusts to mid-30s). Seismic activity is elevated but still below 0.5um/s, microseism is also elevated and getting worse due to a mag 6.3 EQ in the Philippines. Set ISI-Config set to EARTH_QUAKE_V2.            
Commissioning: The commissioning team is working feverishly ahead of projected arrival of the EQ. 
Outgoing Operator: TJ
 
Activity Log: All Times in UTC (PT)

23:00 (16:00) Start of shift
23:10 (16:10) Kyle – Back from Mid-Y
23:41 (16:41) Lockloss – Mag 6.3 EQ near the Philippines 
23:45 (16:45) Nutsinee – LVEA to adjust HWSX alignment
23:49 (16:49) Keita – Going into the LVEA
00:02 (17:02) Keita – Out of the LVEA
00:04 (17:04) Kiwamu – Tour in the LVEA
00:11 (17:11) Nutsinee – Out of the LVEA
00:30 (17:30) Kiwamu – Out of the LVEA
04:08 (21:08) Relocked at NOMINAL_LOW_NOISE with 51.0W & 53.2Mpc	
04:30 (21:30) Set Intent Bit to Observation
04:52 (21:52) Lockloss – Mag 5.8 EQ near New Zealand
05:25 (22:25) ETMX – RMS WD tripped - Reset
05:26 (22:26) HAM6 – SUS & ISI WD tripped – Reset
06:25 (23:25) Locked at NOMINAL_LOW_NOISE	
06:26 (23:06) Intent Bit Set to Observing
06:30 (23:30) Ending Shift 


Title: 09/23/2006, Evening Shift 23:00 – 07:00 (16:00 – 00:00) All times in UTC (PT)
Support:  Kiwamu, Sheila,         
Incoming Operator: N/A

Shift Detail Summary: It was a struggle to relock the IFO after the Philippines earthquake. With much assistance and perseverance, were able to relock and eventually take the IFO to NOMINAL_LOW_NOISE. The environmental conditions are good. Wind is no more than a Light Breeze (max 7mph), Microseism is centered around 0.08um/s. However, seismic started to ring up due to a Mag5.2 EQ near New Zealand, which eventually broke lock. Was able to switch the ISI to Eaeth_Quake_V3 before Lockloss, but not soon enough to prevent the Lockloss. 
  
The New Zealand EQ was followed by back to back Mag4.9 & Mag4.7 earthquakes near the Reykjanes Ridge. Seismic recovered in about an hour. Much trouble relocking, and Roll Modes still a bit elevated. Finally, able to get to NOMINAL_LOW_NOISE with Intent Bit set to Observing. Will take a small success and call it a night before another earthquake comes along to break the lock.   	   	 