Displaying report 1-1 of 1.
Reports until 17:57, Tuesday 27 September 2016
H1 CAL (CAL, DAQ)
aaron.viets@LIGO.ORG - posted 17:57, Tuesday 27 September 2016 (30028)
Restarted GDS pipeline at LHO
I restarted the calibration pipeline at Hanford at gps time 1159058357. Based on tests, the current latency is ~5-10 seconds. The filters file used can be found in the calibration SVN:

aligocalibration/trunk/Runs/PreER10/GDSFilters/H1GDS_ 1158989379.npz

See this aLOG for information on the filters:

https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=30013

The command line used to run the pipeline was gstlal_compute_strain 
        --data-source=lvshm 
        --shared-memory-partition=$LIGOSMPART 
        --filters-file=$filter_file 
        --ifo=H1 
        --frame-duration=4 
        --frames-per-file=1 
        --write-to-shm-partition=$HOFTSMPART 
        --compression-scheme=6 
        --compression-level=3 
        --control-sample-rate=4096 
        --expected-fcc=341.0 --partial-calibration

Note: the redundant pipeline on h1dmt2 was started at gps time 1159062755, a bit after the primary pipeline.
Displaying report 1-1 of 1.