I restarted the calibration pipeline at Hanford at gps time 1159058357. Based on tests, the current latency is ~5-10 seconds. The filters file used can be found in the calibration SVN:
aligocalibration/trunk/Runs/PreER10/GDSFilters/H1GDS_ 1158989379.npz
See this aLOG for information on the filters:
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=30013
The command line used to run the pipeline was gstlal_compute_strain
--data-source=lvshm
--shared-memory-partition=$LIGOSMPART
--filters-file=$filter_file
--ifo=H1
--frame-duration=4
--frames-per-file=1
--write-to-shm-partition=$HOFTSMPART
--compression-scheme=6
--compression-level=3
--control-sample-rate=4096
--expected-fcc=341.0 --partial-calibration
Note: the redundant pipeline on h1dmt2 was started at gps time 1159062755, a bit after the primary pipeline.