TITLE: 09/30 Day Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Power glitched -- Front Ends are down (but Beckhoff seems to have survived). Waiting for people to show up to help with the recovery.
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Kiwamu and Stefan left the interferometer locked and asked me to touch knobs to try to reduce broad bump around 100-1kHz. I gained about 15 Mpc by putting -0.05 offset to CSOFT pitch and CSOFT yaw (details and pretty plot in alog30085) but didn't get rid of the mysterious bump. Terra was here all night dealing with PI.
LOG:
13:08 Power glitched
13:29 Richard to CER
13:31 Richard going to power cycle stuff at end station
14:41 Jeff B. going to EX to check on dust monitor vacuum pump
14:56 Jeff done at EX, going to EY.
14:59 Turn over to Corey