Reports until 20:45, Friday 30 September 2016
H1 General
Link
edmond.merilh@LIGO.ORG -
posted 20:45, Friday 30 September 2016
(30125)
Mid Shift Summary - Eve
LASER tripped off due to a Diode chiller error but I was able to reset and restart.
TCS Y chiller water topped off
some pesky earthquake action broke a lock which only resulted in a short down time. ISI blends were switched to EQ_v2
µseism holdong steady below .02µm/s
wind speeds barely exceeding 10mph
Some locklosses occurring at LOWNOISE_ASC/COIL_DRIVERS