(corey, eric, hugo, mitch)
#7
Started assembling Stiffener under Stage-0. Managed to get about 75% done, and called it an early day due to high temperatures in Staging (swapping HVAC filters took temperature from 65deg to 72). So, we didn't want to have more sweat than normal drop on Class-A parts.
Horizontal L4Cs
Helped Hugo troubleshoot issues with corner 3 L4Cs (we couldn't see their signal). Hugo eventually tracked down the issue to all (3) BIO Interface boxes & Corner (3) Anti-Alias boxes being turned OFF.