* PSL down all shift for troubleshooting * 15:09 UTC Jeff B. opening rollup door between cleaning and receiving area 15:48 UTC Jim B. taking down h1lsc0 frontend to allow Filiberto to turn off IO chassis. (WP 6197) 16:13 UTC Ed starting WP 6198 16:24 UTC Filiberto done 16:33 UTC Filiberto to end Y EE room to look at remote reset for STS2 seismometer. (Hugh reports it is not working) 16:40 UTC Jeff B. starting check of dust monitors in LVEA 16:42 UTC Cheryl to TCSY table to check for water leaks 16:43 UTC Betsy starting ESD charging measurements on both ETMs 16:51 UTC Peter to PSL rack to look at connectors and signals related to chiller 16:59 UTC Hugh going to ITMX for CPS work (WP 6207) 17:05 UTC Jeff B. moving to end Y (compressor room and VEA) 17:15 UTC Gerardo to LVEA to check TCS chiller pipes for water leaks 17:16 UTC Richard transitioning LVEA to laser safe 17:19 UTC Filiberto's work on STS seismometer at end Y tripped ISI. Jim W. turned off sensor correction. Betsy restarting ESD charge measurements. 17:29 UTC LVEA transitioned to laser safe 17:29 UTC Jeff B. moving to end X (compressor room and VEA) 17:37 UTC Hugh back to ITMX 17:37 UTC Cheryl done, checked both TCS tables, no signs of water. 17:47 UTC Betsy turning TCS laser back on (tripped, cause unknown). Holding off on charge measurements due to multiples ISI trips at both end stations 17:53 UTC Jamie starting guardian update (WP 6208) 17:54 UTC Gerardo done 17:59 UTC Ed done 18:06 UTC Jeff B. done 18:12 UTC Hugh to end Y to look at CPS 18:22 UTC Chandra going for jog on X arm 18:28 UTC Filiberto done 19:04 UTC Peter and Jason breaking for lunch 19:52 UTC Betsy restarting charge measurements 20:19 UTC Peter and Jason back to LVEA PSL racks 20:34 UTC Hugh to LVEA to check CPS for BS 20:52 UTC ETM charge measurements done 20:55 UTC Chandra to mid Y to fill CP3 22:00 UTC Betsy to optics lab 22:05 UTC Vern to LVEA to check on Peter and Jason 22:50 UTC Photographer for Science magazine through gate Forgot to log time: Karen and Christina to LVEA to swift