H1 General
travis.sadecki@LIGO.ORG - posted 00:00, Wednesday 05 October 2016 (30225)
OPS Eve Shift Summary

TITLE: 10/05 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:  PSL came online just as my shift was starting.  After a straightforward initial alignment, we made it to NLN with little issue (see aLog 30222 for the little issue).  Robert did PEM injections for the first half of the shift, then Sheila has been commissioning for the remainder.
LOG:

23:00-3:00 Robert to LVEA several times for injections

6:10 Filled TCSY chiller

6:40 Sheila to LVEA

6:57 Sheila out