SEI: All OK – Working on ESs sensor correction SUS: No Report CDS Ele: All OK CDS Swt: All OK – Fixed problem with bad commissioning frame effecting NDS PSL: All OK – PSL has been running since the Diode controller swap TCS: No Report VAC: All OK – Kyle planning for the 5 day RGA bake out at End-X