(corey, eric, hugo, jim)
#6
Horizontal L4Cs were installed and then Actuators were installed. Here are the S/Ns:
Actuators
Horiz L4C
Cabling was pinned out and connected for (4) of the Actuators
#7
Lockers assembled (not installed). Horiz L4Cs were staged on Stage0 (this will make installation of them much more easier than in-situ post Stage-1 install).
Horiz L4C