Reports until 16:11, Wednesday 06 June 2012
X1 SEI
corey.gray@LIGO.ORG - posted 16:11, Wednesday 06 June 2012 (3048)
ISI Assembly Work: Actuators, L4Cs, Lockers, Oh My.

(corey, eric, hugo, jim)

#6

Horizontal L4Cs were installed and then Actuators were installed.  Here are the S/Ns:

Actuators

Horiz L4C

Cabling was pinned out and connected for (4) of the Actuators

#7

Lockers assembled (not installed).  Horiz L4Cs were staged on Stage0 (this will make installation of them much more easier than in-situ post Stage-1 install).

Horiz L4C