Reports until 16:04, Sunday 23 October 2016
H1 General
edmond.merilh@LIGO.ORG - posted 16:04, Sunday 23 October 2016 (30488)
Shift Summary -Day

16:44 Begin bringing back IFO from computer crash.

17:06 Begin aligning/locking process

17:48 on the hone with Dave Barker about a ALS_XARM guardian node I was having trouble restarting. Ezca connection error to H1:ALS-X_WFS_SWITCH channel

22:00 Damping ITMY bounce mode. Flipped sign on gain and added .1 gain

22:40 damped PI mode 27 by flipping the sign and then adding 30 degrees to the phase.

22:58 PI Mode 27 needed another sign flip

22:47 NLN ≈60MPc. Handing off to Nutsinee