Trouble keeping ISS locked through beginning of shift. Had to keep relocking by hand. IMC kept losing lock. Found glitching on H1:ALS-Y_REFL_CTRL_OUT_DQ and H1:ALS-X_REFL_CTRL_OUT_DQ. Jenne, Sheila and Kiwamu tried to isolate the cause. Cause not found, but glitching eventually gone. Attempting to lock. Handing off to Travis. 23:18 UTC restarted video0 23:31 UTC lock loss (Jeff, Jenne) 23:35 UTC Chandra to LVEA, RGA between HAM5 and HAM6 01:16 UTC Initial alignment 01:42 UTC Initial alignment done 02:32 UTC ISI config changed to WINDY_USEISM, never moved past not all nodes arrived 02:46 UTC ISI config changed to USEISM_NOBRSXY 04:31 UTC Jenne and Sheila to end Y to check on ALS laser 05:23 UTC Jenne and Sheila back. Jenne to LVEA to block ALS light pipe. 06:14 UTC Jenne and Sheila at end Y to replace PLL signal with electronics. 07:10 UTC Jenne and Sheila back