TITLE: 10/16 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Aquisition
INCOMING OPERATOR: Jeff
SHIFT SUMMARY: Locked for most of my shift, last 30min it broke. To keep it locked when the range has drifted to ~35Mpc, adjust SRM to minimize POP90. Seemed to help get a 10Mpc and keep it locked. Evan H. has been doing some work, and we are on our way back up now.
LOG: