Pressure is moving slowly. Today the annulus system was evacuated with no noticeable impact. Tomorrow Gerardo will spray helium on new conflat joints.
For reference BSC8 reached 1e-6 torr in ~2 days with the same size turbo. ENDY has the additional load of the iLIGO stack.
BSC06 annulus pump down started at 11:59 am.