Reports until 08:45, Saturday 22 October 2016
H1 General
edmond.merilh@LIGO.ORG - posted 08:45, Saturday 22 October 2016 (30747)
Shift Summary - Day Transition
TITLE: 10/22 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Aquisition
OUTGOING OPERATOR: Patrick
CURRENT ENVIRONMENT:
    Wind: 6mph Gusts, 1mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.34 μm/s 
QUICK SUMMARY:
Patrick summed up the nights IFO conditions. I think I may try reverting ring heaters temps in an effort to try and mitigate the PI issue because clearly what we have now isn't working. Will most likely give Terra a call in a bit. Also, MC3 is showing EXC with 1 TP open.