16:45 Small cube truck on site for Bubba. (Gutter Kings) Installation of gutters on the North Side of OSB. WP#6266
17:27 Peter and Jason into the PSL . WP#6268
17:39 Kyle out to EX to take measurements
17:45 Took IMC to 'OFFLINE' as per the request of Peter and Jason
17:56 ISI config changed to no BRS for both end stations for maintenance purposes
17:58 Fil at EY
18:00 Gerardo out to execute WP#6270
18:27 Kyle back from EX
18:37 Fil leaving EY
19:00 Fil at EX
19:03 Jason and Peter out. Circumstances did not allow the intended task to be performed
19:08 Fill leaving EX
19:10 Begin bringing the IFO back. IMC locking a bit daunting. Cheryl assisting.
19:12 BRS turned on at both end stations
19:35 reset PSL Noise Eater
20:39 having some dificulty aligning X-arm
20:40 Rick S and aguest up to the observation deck
20:59 Sheila out to PSL rack
21:11 Jeff into CER
21:41 Bubba to MX to inspect a fan
22:25 Chandra to MY to do CP3