Shift Summary - Day
 
 
TITLE: 10/24 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Aquisition
INCOMING OPERATOR: TJ
SHIFT SUMMARY:
LOG:

16:45 Small cube truck on site for Bubba. (Gutter Kings) Installation of gutters on the North Side of OSB. WP#6266

17:27 Peter and Jason into the PSL . WP#6268

17:39 Kyle out to EX to take measurements

17:45 Took IMC to 'OFFLINE' as per the request of Peter and Jason

17:56 ISI config changed to no BRS for both end stations for maintenance purposes

17:58 Fil at EY

18:00 Gerardo out to execute WP#6270

18:27 Kyle back from EX

18:37 Fil leaving EY

19:00 Fil at EX

19:03 Jason and Peter out. Circumstances did not allow the intended task to be performed

19:08 Fill leaving EX

19:10 Begin bringing the IFO back. IMC locking a bit daunting. Cheryl assisting.

19:12 BRS turned on at both end stations

19:35 reset PSL Noise Eater

20:39 having some dificulty aligning X-arm

20:40 Rick S and aguest up to the observation deck

20:59 Sheila out to PSL rack

21:11 Jeff into CER

21:41 Bubba to MX to inspect a fan

22:25 Chandra to MY to do CP3