PSL had a need to access a particular feedthru for their In-Vacuum Cable runs. Although the LHAM2 layout managed to reflect this it did not get propagated to LHO documents. So we had to swap the feedthrus on D2 & D5. The layout is D1002873. Version v6 shows how we initially installed them. In v7 there is a text file to the effect of the change but the layout itself is not yet updated. There are two open ports now on D5 as these take 5-way Coax. These Feedthrus are in C&B now and I hope we can get these on before the next pump down.