H1 SYS
hugh.radkins@LIGO.ORG - posted 16:50, Monday 11 June 2012 (3087)
WHAM2 E-FeedThrus Swapped
PSL had a need to access a particular feedthru for their In-Vacuum Cable runs.  Although the LHAM2 layout managed to reflect this it did not get propagated to LHO documents.  So we had to swap the feedthrus on D2 & D5.  The layout is D1002873.  Version v6 shows how we initially installed them.  In v7 there is a text file to the effect of the change but the layout itself is not yet updated.
There are two open ports now on D5 as these take 5-way Coax.  These Feedthrus are in C&B now and I hope we can get these on before the next pump down.