Work Permit |
Date |
Description |
alog/status |
|
|
|
|
6280.html |
2016-10-25 16:29 |
DAQ NDS has bug which reports many errors to the log file when it encounters the new MD5 files. Fix is to remove this reporting from the nds process (note, not the daqd process). |
30875 |
6279.html |
2016-10-25 09:19 |
Perform timing-related measurements at end stations. Output of the CW injection will be disabled for a short while. |
30854 |
6278.html |
2016-10-25 08:51 |
Investigate apparent clipping of Pcal beam, first trying to determine which beam is clipping. Adjust alignment to relieve clipping. Re-calibrate if adjustment of alignment is required. |
30827 |
6277.html |
2016-10-25 08:31 |
Perform scheduled maintenance to scroll compressor #3, #4, #5 @ X-End vent/purge-air supply skid. Maintenance activity will require for the compressors to run for brief periods of time. Lock-out/tag-out power to skid. |
30853 |
6276.html |
2016-10-25 08:07 |
Increase the light on ISS PDA (first loop) [Change the neutral density filter to a less dense number?] |
30871 |
6275.html |
2016-10-25 07:31 |
Update NDS2 client software to version 0.13.0 for Ubuntu 12 and Ubuntu 14 workstations. |
30843, 30859 |
6274.html |
2016-10-24 15:05 |
Remove view port covers in input optics area, output optics area and end stations. Plastic sheet will be available if not already present. LVEA/VEA will be laser hazard. |
30867 |
6273.html |
2016-10-24 14:36 |
Add whitening filter to PMC HVMon channel. |
30846, 30859 |
6272.html |
2016-10-24 12:42 |
Experiment with frame write priority/scheduling settings to help address re-transmit issues. We will reconfigure h1fw2 and if the changes do not cause regressions may move the configuration to h1fw0 & h1fw1. |
30859 |
6271.html |
2016-10-24 11:12 |
E1600292 was approved and will be applied to the VCO in the corner station. This will remove 420kHz noise from the VCO +/- 24V rails. |
30869 |
6270.html |
2016-10-24 10:55 |
Remove and replace UPS batteries for Y-END, X-END, Y-MID, X-MID, and Corner Station vacuum racks. |
30823 |
6269.html |
2016-10-24 10:22 |
Start and run QDP80 pumps (minimum of 30 minutes as routine PM) * Energize Main Turbo Pump controllers and note indicated pressures on either side of fore line isolation valve (aka "Safety Vale") * with header side of Safety Valve at minimum pressure, dump accumulated gas withing turbo pump into fore line via briefly opening Safety Valve * Record pressures in turbos afterwards as "t0" for long term rate-of-rise measurement |
30873 |
6268.html |
2016-10-24 10:12 |
Install picomotors into the mounts for mirrors M06 and M07. This will allow remote tweaking of the beam alignment into the PSL PMC. The PSL will remain up, although we will close the external shutter when actually installing the motors. The beam alignment into the PMC will need to be re-done after the installation. |
30798, 30801 |
6267.html |
2016-10-24 10:04 |
Check/recharge AR HEPI Fluid Accumulators: All SEI platforms down, Fluid Pump Stations Off, check pressure in Accumulators, recharge as needed. Return system to operation. 2ish hours. |
30850 |
6266.html |
2016-10-24 09:50 |
Install gutter on the north side of the OSB Building. |
|
6265.html |
2016-10-24 06:41 |
Perform quarterly lubrication of all Axivane Supply Fans on site. |
|
6264.html |
2016-10-21 15:16 |
Expand H1EDCU_DAQ.ini to include the new DAQ diagnostics EPICS channels. DAQ restart required. |
30859 |
6263.html |
2016-10-21 13:52 |
Removal of ISI-WIT projections of GS13s into supension point, as is now covered by SEI models (E1600028). Also revamp of SUS channel storage in the frames (E1600316). |
30728, 30821, 30844, 30859 |
6262.html |
2016-10-21 13:34 |
Pull/Extend picomotor controller cable (DB25) cable from ISCT1 into PSL. Cable will then be connected to picomotor breakout box D1101738 inside PSL. |
30726 |
6261.html |
2016-10-21 09:24 |
Do a noise measurement on the PSL HV power supply in the CER mezzanine. |
30781, 30725 |
6260.html |
2016-10-19 14:07 |
Turn off Proxmox server to install more memory (Proxmox is a virtual host that holds: Matlab license server, autoburt and H0epics) those server will shutdown as well during the installation time. |
30859 |
6259.html |
2016-10-19 13:41 |
Improve diagnostics: better error check for ALS end stations when locked with red; enable device info. |
30842 |
|
|
|
|
Previous Work Permits |
|
|
|
6247.html |
2016-10-17 08:57 |
Pull power and network cable for RGA in corner station. Work will consist of climbing over HAM4 and pulling around BSC2 and BSC3. |
30635, 30799 |