Ops Shift Log: 10/26/2016, Owl Shift 07:00 – 15:00 (00:00 - 08:00) Time - UTC (PT) State of H1: IFO is unlocked. Working on relocking after the maintenance window Intent Bit: Commissioning Wind: Is ranging from Calm to Light Breeze (0-7mph) 0.03 – 0.1Hz: Currently at 0.07um/s – Ringing down from EQ 0.1 – 0.3Hz: Trending lower – Currently at 0.8um/s Outgoing Operator: TJ Incoming Operator: Travis Activity Log: Time - UTC (PT) 07:00 (00:00) Take over from TJ 07:45 (00:45) Adjust Dust Monitor alarm levels 12:18 (05:18) Put IFO into DOWN, due to alignment and locking troubles 13:30 (06:30) End Shift early. Shift Details: Support: Sheila Shift Summary: IFO unlocked. After a difficult but successful Initial Alignment by the Evening shift, working on relocking. After a long night (very long for Sheila) of many tweaks were able to get the IFO to lock at DC_READOUT once for about 30 minutes. After this lock broke we were unable to get past green locking. There are problems with INPUT_ALIGN hanging at LOCKING_XARM_IR, (see aLOG #30881). Sheila did not think there was much chance of successful locking. I put the IFO into DOWN to await the refreshed minds and fingers of the day shift to continue the good works of the past two shifts.