TITLE: 10/26 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Aquisition
INCOMING OPERATOR: TJ
SHIFT SUMMARY: First half of the shift was dedicated to Kiwamu/Jason chasing PSL alignment. As soon as they determined that the pointing was OK, and gave me the go-ahead to start locking, we were hit by the 6.1 EQ in Italy. After waiting for that to ring down, Jenne and I began diagnosing the issues with INPUT_ALIGN during Initial Alignment.
LOG:
16:07 Chandra, John to MY
16:50 Richard to EY
17:00 Jason, Kiwamu to PSL
17:37 Richard back
17:38 Betsy to LVEA
18:10 Jason, Kiwamu out
18:12 Betsy out
18:59 Jason, Kiwamu to IOT2L
19:02 Chandra back, going to EX
19:49 Betsy to LVEA TCSy table
19:55 Kiwamu to LVEA marking wall
22:08 Chandra to MY