Reports until 09:47, Monday 31 October 2016
edmond.merilh@LIGO.ORG -
posted 09:47, Monday 31 October 2016 (31026)
-
SEI - running fine. EQ mitigation is satisfactory. Wind mitigation is ongoing.
-
SUS - nothing to report
-
CDS electronics - running ok. there are a few WP items to finish regardgin BIO readbacks and 24V runs in corner.
-
CDS SW - HWS work is ongoing
-
PSL - Peter is looking to measure water flow into the laser heads using a clamp on meter that is being brought in by a vendor. He hopes that the vendor will leave the device for a period of time.
-
VAC - nothing or today
-
FAC - the exit gate is malfunctioning and stuck in the UP position
-
Work Permits