Shift Summary - Day
TITLE: 10/31 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Wind
INCOMING OPERATOR: Corey
SHIFT SUMMARY:
Locked early in the shift and then instructed to stay in DOWN due to weather.
LOG:

15:49 Jeff B to mid stations to check on 3IFO items

16:03 Cleaning crew into highbay area before the LVEA to get some C3 covers.

16:07 Intention bit set to UNDISTURBED

16:13 Intention bit reverted to COMMISSIONING mysteriously (it seems)

16:15 Intention bit reset to UNDISTURBED

16:25 Jeff B to EX TMS lab

16:54 Jeff B is back

17:50 IFO will be in DOWN fo the duration of the shift due to high winds

18:25 Travis, Darkhan and Yuki to EY for PCal calibrations

19:21 Sheila out to the LVEA to plaug in power monitors for ESD

20:11 Travis and co. back

21:14 Carlos to EY to take image of the HWS computer

21:25 BRS disabled at BOTH end stations now.

21:27 Robert into PSL enclosure

21:37 Peter out to the LVEA to trace out a cable

21:38 Sheila to end stations to plug in power mointors for ESD

21:42 Automated phone call about a malfunction in a Hanford alarm test. additional testing will be done between 2:45 and 3:45PM

21:53 Peter is back

22:00 Fil out to LVEA North bay to look for a rack stand

22:27 Sheila back.