15:49 Jeff B to mid stations to check on 3IFO items
16:03 Cleaning crew into highbay area before the LVEA to get some C3 covers.
16:07 Intention bit set to UNDISTURBED
16:13 Intention bit reverted to COMMISSIONING mysteriously (it seems)
16:15 Intention bit reset to UNDISTURBED
16:25 Jeff B to EX TMS lab
16:54 Jeff B is back
17:50 IFO will be in DOWN fo the duration of the shift due to high winds
18:25 Travis, Darkhan and Yuki to EY for PCal calibrations
19:21 Sheila out to the LVEA to plaug in power monitors for ESD
20:11 Travis and co. back
21:14 Carlos to EY to take image of the HWS computer
21:25 BRS disabled at BOTH end stations now.
21:27 Robert into PSL enclosure
21:37 Peter out to the LVEA to trace out a cable
21:38 Sheila to end stations to plug in power mointors for ESD
21:42 Automated phone call about a malfunction in a Hanford alarm test. additional testing will be done between 2:45 and 3:45PM
21:53 Peter is back
22:00 Fil out to LVEA North bay to look for a rack stand
22:27 Sheila back.