Reports until 13:30, Wednesday 13 June 2012
H1 INS
jodi.fauver@LIGO.ORG - posted 13:30, Wednesday 13 June 2012 (3116)
HAM2/3 Install Prep
The cleanroom at HAM 2 was shifted as far to the south as possible. The cleanroom that had been used for BSC1 ICC garbing/staging was converted to a large garbing room for use at both HAM2 and HAM3 for the next several weeks. Two Type C cleanrooms will be moved into place for use at HAM2 and HAM3. Several SUS shelving units were moved to make way for short-sided BSC cleanroom over HAM3: that activity should take place after lunch but before safety meeting.