- After the demod board was fixed, we could not transition to DRMI 3f. Stefan found that there was no 3f signal to transition to. He and Richard went out and disconnected/reconnected cables and it came back. - Evan changed something in the ALS guardian code that had to be fixed. - There was a 6.4 earthquake in Chile. - I ran through an initial alignment near the beginning of the shift. - Sheila told me that although there is less sensitivity to alignment in locking PRMI, there is currently something not quite right about the PRMI acquisition and we have a better chance of acquiring DRMI than PRMI now. - I tried to go from PRMI to DRMI, but guardian would not let me. Sheila said she has fixed this now. - We made it to NLN at 22:56 UTC. 15:07 UTC Robert to PSL enclosure to 'move hot things around'. 15:10 UTC Richard to PSL ISC racks 15:38 UTC Richard back. Demod chassis swapped with spare. 15:40 UTC Robert back 15:55 UTC Kyle to LVEA to take measurement with tape measure 16:08 UTC Kyle back 16:10 UTC Gerardo to LVEA to check ion pumps 16:14 UTC Peter to diode room to take inventory 16:17 UTC Robert and Richard to LVEA 16:23 UTC Richard and Robert back? 16:29 UTC Peter done 16:37 UTC Robert back 16:42 UTC Richard to LVEA to get Torque wrench Earthquake: 6.4 25km ESE of Curico, Chile 2016-11-04 16:20:43 (UTC) 16:53 UTC Richard to LVEA to swap back in original demod chassis 17:21 UTC Richard back 17:29 UTC Keita done zeroing dark offsets on LSC photodiodes 17:57 UTC Starting initial alignment 18:38 UTC Done initial alignment. SRC had trouble locking. 18:51 UTC Lost lock twice going to LOCK_DRMI_3F. Stopping at DRMI_ENGAGE_ASC. 21:14 UTC Sheila to LVEA 22:01 UTC Robert to end Y to pick up speaker from VEA 22:33 UTC Robert back