24V was tied from CER power racks to junction boxes in LVEA. New 24V will power the following:
1. Photodiode amplifier units (Beckhoff terminals)
2. New ITM spool camera (to be installed, Beckhoff terminal)
3. BRS system (next to BSC3)
4. RGA installed next to HAM4
Cable run goes from CER mezzanine to junction box on top of SUS-R3 (next to HAM4). From this junction box, we split to junction boxes on top of SUS-R5 and SUS-R6. As of now, nothing on the floor is being powered off the new 24V line. New work permit will be required as certain items will need to be powered off.