Ops Day Shift Summary
Work today included:
Daniel and Conor working on the squeezer setup in the east bay (no laser yet activated, should be a couple of weeks).
BSC9 @ EX was vented to allow for the optic to be locked down and some photon calibrator work. The area is thus still in laser hazard.
More electronics rack moving/sorting/packing/something at MX.
Initial setup for some of the future control room workstations, being initially built and tested in the computer user room.
Doug went to EY to see if he'd left teflon tape on the EQ stops in BSC10, which he didn't.