Reports until 16:13, Monday 08 November 2010
LHO FMCS
dani.atkinson@LIGO.ORG - posted 16:13, Monday 08 November 2010 (314)
Ops Day Shift Summary
Work today included:

  • Daniel and Conor working on the squeezer setup in the east bay (no laser yet activated, should be a couple of weeks).
  • BSC9 @ EX was vented to allow for the optic to be locked down and some photon calibrator work. The area is thus still in laser hazard.
  • More electronics rack moving/sorting/packing/something at MX.
  • Initial setup for some of the future control room workstations, being initially built and tested in the computer user room.
  • Doug went to EY to see if he'd left teflon tape on the EQ stops in BSC10, which he didn't.