Reports until 09:43, Monday 14 November 2016
LHO General
patrick.thomas@LIGO.ORG - posted 09:43, Monday 14 November 2016 (31464)
Morning Meeting Notes
SEI: No issues. If there is trouble relocking due to environmental noise please notify Jim W. He would like to use the time for testing.
SUS: Investigating ITMY long damping time. Fix bug in quad suspension monitor models.
CDS: OAF troubleshooting. Summary of events: ADC added -> started glitching. ADC removed -> glitching continued. Reseated cards -> glitching continued. Fiber patch? -> glitching continued. Moved cards to new IO chassis -> glitching continued. New timing slave? -> glitching continued. To try: Changed SFP for timing. Swap two of the ADCs.
PSL: Turn off DBB. Touch up optical lever centering for BS and ETMY.
VAC:
Drift up in pressure registered by PT170, PT180, PT140. Prepare valves connecting either PT170 or PT180 for bakeout. May need to move Genie lift.
Kyle to continue testing pump at end X (WP 6310).
A note that the red indicator on the vacuum overview for IP12 is fine, it is valved out.
CP3 can now be filled from the control room.
FAC: Still looking for H2O leak. 
PEM: Robert and Anamaria here at the end of the month to run PEM injections.