Reports until 21:23, Monday 14 November 2016
H1 General
corey.gray@LIGO.ORG - posted 21:23, Monday 14 November 2016 - last comment - 23:29, Monday 14 November 2016(31482)
Mid Shift Status: Short NLN Locks

Summary:  Back to locking, but locks do not last long so far (15-25min).  

After Sheila, Patrick, & Jeff restored H1 to a point we could lock it, have been going to Nominal Low Noise.  Unfortunately, it only stays locked for a little while.  During the last NLN lock, could see: 

Have turned off some Calibration Lines because of wanting to run some measurements for Jeff K.  (will need to remember to turn them back on).

Images attached to this report
Comments related to this report
corey.gray@LIGO.ORG - 23:29, Monday 14 November 2016 (31484)

Chatted with Sheila about the recent locklosses (noted above)  & Sheila suggested a few things to try:

Run Lockloss Tool

Zoomed in on SRC1_P_OUT & DHARD_P_OUT to see what frequency they were ringing up at and it looks like just under 0.5Hz.  (see attached)

Take SRC1 Pit to 0.0, Open Beam Diverter, & Tweak SRM

Haven't tried this yet.  Want to either skip the CLOSE BEAM DIVERTER step or Close them after the fact.  Then want to take SRC1_P's gain to zero, and then tweak the alignment of SRM such that you:

  • Minimize POP90 (most important)
  • And maximize AS90
Images attached to this comment