TITLE: 11/16 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Travis
SHIFT SUMMARY:
Started the shift with numerous activities (ASC insvestigatinos, ISI ITMy investigations, PI observing, & ITMy oplev OLGs). Eventually made it to a stable state & have been in Observing ever since. Can take H1 to NLN, but might want to -manually- skip the CLOSE BEAM DIVERTERS state, so we can monitor AS90/POP90. We have been locked for 2+hrs with the REDUCE_RF9_MODULATION_DEPTH step, so perhaps we are good here (and don't have to worry about opening SRC1 P & Y loops as Sheila mentioned).
Had almost 1hr of double coincidence during the shift.
LOG:
To Do List: