TITLE: 11/17 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Corey
SHIFT SUMMARY: 16hr lock ended a few hours before the end of my shift. Things seemed to be misaligned after and it took me a bit, and with much help, to get it through an initial alignment. Handling off to Corey who may need to do another IA.
LOG:
-
16:51 Joe headed out to start beamtube enclosure sealing. We currently in Low Noise, it would be interesting to see if we can see his work.
-
15:54 Keita starting ASC work, out of Observing.
-
17:24 HAM1 HEPI tripped, reisolated and we kept full LN lock. H1:ASC-AS90_OVER_POP90_MON bumped up a bit on the FOM.
-
17:36 Richard to CS roof to replace anemometers
-
18:00 Richard down
-
18:03 Joe back
-
19:54 Richard headed to outbuildings to replace anemometers
-
21:08 Joe heading back out to do more beam tube enclosure sealing.
-
21:33 Kingsoft on site
-
21:47 Lockloss. ASC control signals started picking up, couldnt narrow it down more yet.
-
22:08 Joe back and done.