TITLE: 11/17 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 64.0999Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Lockloss in the early part of my shift, it tripped HAM6, ETMY ISI, and then 7min later HAM3. After ITMY stopped swinging, it was straight foward to bring back up. Since then it has been locked for 6hrs in and out of Observing for me to run a2L and Terra will sometimes turn on/off PI gains.
LOG:
-
17:20 Lockloss. Tripped HAM6 ISI and ETMY ISI. Then 7min later HAM3, earthquake maybe but nothing on the BLRMS yet.
-
17:28 Chandra to LVEA
-
17:50 Chandra out
-
18:08 Joe heading out to Yarm to do more beam tube enclosure sealing
-
18:12 Richard heading to EY
roof to replace anemometers checking phones in building, then to MY to roof for anemometers
-
18:18 Observing
-
18:36 Fil to EY to help Richard
-
19:15 Ken will be hammerdrilling in the mech room. Might be worth trying to see if we can see it.
-
20:02 Out of Observing to run a2L
-
20:09 Observing
-
20:15 Joe back
-
20:19 Ken is done hammerdrilling, now headed to the mezzanine
-
20:33 Richard to MX for anemometer replace
-
21:28 Out of Observing to run a2L
-
21:33 Observing
-
21:37 Richard back
-
21:51 Ken all done
-
22:57 Out of Observing to run a2L
-
23:19 Observing. Should have been for the last 10min but I was distracted by other work.