TITLE: 11/18 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Observing at 66.2053Mpc
INCOMING OPERATOR: TJ
SHIFT SUMMARY: Locked for 22 hours and counting.
LOG:
07:50 Started ITMX HWS script (left it off to test some other script on Wednesday and forgot to run it)
08:01 Increased violin mode damping gain for ETMY 508.585
08:08 Chaged CO2Y power upper limit so the ODC bit is green. Accepted the change in SDF.
12:43 LLO lost lock. Took IFO out of Observing so I can do some PRM test for Sheila. Here's what happened:
13:36 LLO back to Observe. Slowly revert PRM gain and took some DARM spectrum in the process.
13:51 Back to Observing
~15:20 Joe moved a ladder from Mid of sec1 Y beamtube to Y12.
15:10-15:15 Weird noise in AS90/POP90 (see attachment). I was looking at Sheila's Build_ups striptool and only POPAIR_B_RF90 seems to see this.