thomas.shaffer@LIGO.ORG - posted 14:09, Friday 18 November 2016 - last comment - 14:46, Friday 18 November 2016(31613)
GracedB Test
ED M., T.J S.
A test candidate was sent. The Audible alarm announced in the control room at 22:03UTC. The H1 Operator Sign-Off on the GracedB system was entered as "NOT OK" Status and the comment was "TEST"
Comments related to this report
peter.shawhan@LIGO.ORG - 14:46, Friday 18 November 2016 (31616)
For the record: The GraceDB trigger used to do this test, https://gracedb.ligo.org/events/view/G262286 , is a fake trigger (and clearly labeled as such in the log) inserted into GraceDB by Mina Cho and Peter Shawhan with group="Burst" and pipeline="CWB2G". That's the same we we did periodic testing of control-room audio alerts during O1. In this case the H1OPS and L1OPS labels were added by hand.