Displaying report 1-1 of 1.
Reports until 17:01, Monday 21 November 2016
LHO General
corey.gray@LIGO.ORG - posted 17:01, Monday 21 November 2016 (31703)
Ops EVE Shift Transition

TITLE: 11/22 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Jim
CURRENT ENVIRONMENT:
    Wind: 5mph Gusts, 4mph 5min avg
    Primary useism: 0.15 μm/s
    Secondary useism: 0.17 μm/s
QUICK SUMMARY:

Jim handed over an H1 just as he was starting to lock after the earthquake.  

Making initial locking attempts (had to tweak the BS [in CHECK MICH FRINGES] & also PRM/BS in PRMI).  Made it to DRMI had now troubleshooting why we drop out of DRMI Lock after a few minutes.

Will check out A2L lines in DC Readout & then aim to get to NLN.

Displaying report 1-1 of 1.