TITLE: 11/22 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Jim
CURRENT ENVIRONMENT:
Wind: 5mph Gusts, 4mph 5min avg
Primary useism: 0.15 μm/s
Secondary useism: 0.17 μm/s
QUICK SUMMARY:
Jim handed over an H1 just as he was starting to lock after the earthquake.
Making initial locking attempts (had to tweak the BS [in CHECK MICH FRINGES] & also PRM/BS in PRMI). Made it to DRMI had now troubleshooting why we drop out of DRMI Lock after a few minutes.
Will check out A2L lines in DC Readout & then aim to get to NLN.