16:40: Krishna out to Biergarten
16:43 Karen into H2 building
17:03 Kyle back from EY
17:07 Green arms aligned: recentered X arm as per oplevs and started from there. Got a good alignment but still not maximum power. Got closer to maximum by tweaking TMS a µrad or two.
17:17 re-started VERBAL ALARMS
17:21 Karen out of H2 building
17:30 Keits to end stations to check on unsed ADC channels
17:45 IA complete. Beginning lock sequence
17:46 Bubba taveling to ends and mids. X -arm first.
18:12 Bubba done with x-arm and heading to Y mid. He'll stand down from EY visit due to current locking.
18:16 Lock loss at close beam diverters. HAM6 ISI tripped.
18:30 Keita called. He's finished at EX and headed to EY
18:45 NLN - switched manually from NOISE_TUNINGS
18:53 King Soft onsite
18:55 Richard back
19:21 a2l script
20:05 Keita is back
21:52 Alarm at CP4
22:10 did remote manual CP3 overfill - 20seconds
22:15 Kyle to MY to visually inspect the remote overfill.
22:41Kyle back
23:50 Robert and Anamaria back from EX