H1 locked for most of shift.  Nothing too exciting: Robert and Anamaia doing PEM work, Terra doing PI work, i did the first non-vacuum team CP3 manual overfill. H1 alignment wasn't optimal; Sheila came in later in the day. The lockloss was due to commissioners doing work.
LOG:
 16:00 Begin initial alignment. IFO seemed stuck at FIND_IR

16:40: Krishna out to Biergarten

16:43 Karen into H2 building

17:03 Kyle back from EY

17:07 Green arms aligned: recentered X arm as per oplevs and started from there. Got a good alignment but still not maximum power. Got closer to maximum by tweaking TMS a µrad or two.

17:17 re-started VERBAL ALARMS

17:21 Karen out of H2 building

17:30 Keits to end stations to check on  unsed ADC channels

17:45 IA complete. Beginning lock sequence

17:46 Bubba taveling to ends and mids. X -arm first.

18:12 Bubba done with x-arm and heading to Y mid. He'll stand down from EY visit due to current locking.

18:16 Lock loss at close beam diverters. HAM6 ISI tripped.

18:30 Keita called. He's finished at EX and headed to EY

18:45 NLN - switched manually from NOISE_TUNINGS

18:53 King Soft onsite

18:55 Richard back

19:21 a2l script

20:05 Keita is back

21:52 Alarm at CP4

22:10 did remote manual CP3 overfill - 20seconds

22:15 Kyle to MY to visually inspect the remote overfill.

22:41Kyle back

23:50 Robert and Anamaria back from EX