TITLE: 11/24 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: Ed
CURRENT ENVIRONMENT:
Wind: 24mph Gusts, 21mph 5min avg
Primary useism: 0.15 μm/s
Secondary useism: 0.51 μm/s
QUICK SUMMARY:
-
Came in to a NLN H1 with PEM Injectors (Anamaria/Robert) working with Kyle (who was on the floor at BSC8's VAC pumps). They then handed over to Sheila...
-
Sheila working on H1.
-
BRSx was in a rung up state & we are letting it ring down. So, will leave SEI_CONFIG in WINDY_NO_BRSX state until Jim looks at it (tomorrow?).
-
Will return to PEM Injection work after they have "lunch".