Reports until 16:51, Friday 25 November 2016
LHO General
thomas.shaffer@LIGO.ORG - posted 16:51, Friday 25 November 2016 (31843)
Ops Eve Shift Transition

TITLE: 11/26 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Calibration
OUTGOING OPERATOR: Ed
CURRENT ENVIRONMENT:
    Wind: 4mph Gusts, 3mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.46 μm/s
QUICK SUMMARY: Robert and Anamaria are doing their injections, we are currently locked at 72Mpc.