Displaying report 1-1 of 1.
Reports until 09:13, Saturday 26 November 2016
H1 General
travis.sadecki@LIGO.ORG - posted 09:13, Saturday 26 November 2016 (31851)
Ops Day Shift Transition

TITLE: 11/26 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Down due to Beckhoff issues
OUTGOING OPERATOR: Nutsinee
CURRENT ENVIRONMENT:
    Wind: 2mph Gusts, 1mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.49 μm/s
QUICK SUMMARY:  Down due to Beckhoff issues per Nutsinee's aLog.  Have contacted Keita and Patrick.  Keita is looking at things remotely and Patrick is on his way to the site.
 

Displaying report 1-1 of 1.