TITLE: 11/26 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: TJ
SHIFT SUMMARY:
LOG:
17:50 Kyle on site checking pumps.
18:01 Patrick to CER
18:05 Robert to EY
19:50 Robert and AnnaMaria to put beam dump in MC Refl, Patrick to CER taking top off of Beckhoff module.
20:30 ECat chassis is fixed. Start relocking.
23:50 PCal X 5001.3 Hz line turned off.