Reports until 16:04, Saturday 26 November 2016
LHO General
thomas.shaffer@LIGO.ORG - posted 16:04, Saturday 26 November 2016 (31862)
Ops Eve Shift Transition

TITLE: 11/27 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Travis
CURRENT ENVIRONMENT:
    Wind: 4mph Gusts, 3mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.36 μm/s
QUICK SUMMARY: On our way back up after some issues described in the log below mine.