Reports until 11:39, Monday 28 November 2016
H1 AOS (DetChar)
jason.oberling@LIGO.ORG - posted 11:39, Monday 28 November 2016 - last comment - 09:48, Tuesday 29 November 2016(31909)
End Station OpLev Glitching (WP 6348)

Following up on the DetChar report of ETMx oplev laser glitching causing problems, I confirmed (using the DetChar summary pages) that the laser was indeed showing signs of glitching.  I also noticed the ETMy laser was also showing signs of glitching.  I increased the power for both lasers to hopefully get them into a thermal state they are happy with.  I used the Current Monitor (outputs a voltage to monitor the current delivered to the laser diode) port on the back of each laser as a guide.  The changes were:

Seeing as I had to open the cooler for both lasers they will both need 4-6 hours to return to thermal equilibrium.  At that point a determination can be made as to whether or not this helped at all.  The attached 3 hour trend of the oplev SUM for both optical levers gives hope; after the power increase the SUM signal is quieter for both oplevs.  I will leave WP 6348 open for now as more adjustment may be necessary to fix the glitching.

Images attached to this report
Comments related to this report
jason.oberling@LIGO.ORG - 09:48, Tuesday 29 November 2016 (31961)DetChar

Further power adjustment for both lasers this morning as both were still showing signs of glitching (better than yesterday morning, but not gone).  Changes are:

  • ETMx
    • Current Monitor Before: 0.830 V
    • Current Monitor After: 0.845 V
  • ETMy
    • Current Monitor Before: 0.880 V
    • Current Monitor After: 0.897 V

As before these lasers will need ~4 hours to return to thermal equillibrium before I can assess whether or not this latest tweak helped.