TITLE: 11/28 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Jim
SHIFT SUMMARY: After the lockloss, we have been in DOWN for PSL PZT work, with other tasks happening opportunistically.
LOG:
16:12 Joe D beamtube patching Yarm
17:37 Lockloss, possibly due to coincident PSL Noise Eater OOR
17:58 Kyle to LVEA PT180
18:06 Jason to EX for OpLev work
18:10 Robert and Kiwamu to PSL PZT work
18:15 Joe D done
18:20 Kyle out
18:22 Jeff B forklifing chiller
18:25 Hugh to EX BRS work
18:30 Jason done at EX
18:33 Jason and Betsy to TCSy table to check flow sensor
18:54 Jason to EY OpLev, SEI_CONF to SC_OFF_NOBRSXY
19:08 Jeff B done
19:21 Jason done
20:02 Hugh done, SEI_CONF set to WINDY_NO_BRSX (Hugh said not to use BRSX yet)
22:08 Switched SEI_CONF back to WINDY since Hugh reports that BRSX is back up
22:34 Dave restarting models
23:55 Kyle to LVEA to close valve